Showing results for "Skyway Stage 3"
-
Skyway Stage 3 toll rates have been released / News
After experiencing 7 months of free use, motorists will now have to pay a toll.
-
Skyway Stage 3 southbound Quirino exit now open / News
That’s a vast improvement from the previous 1 and a half hour travel time.
-
SMC eyes a bus rapid transit system for Skyway Stage 3 / News
The bus rapid transit system will be able to carry a large number of passengers from the northern part of Metro Manila all the way to the south.
-
San Miguel Corporation opens Skyway Extension northbound section / News
Now south residents can have easier access to the Skyway road.
-
TRB approves provisional toll fees for Skyway Stage 3 / News
Skyway Stage 3 will soon be fully operational with the TRB’s provisional approval of the toll rates SMC can collect.
-
Metro Manila Skyway—Everything you need to know / Featured Article
Here is what you need to know about the Metro Manila Skyway and its constant evolution as an elevated expressway in the Philippines.
-
SMC: Skyway extension northbound is now structurally complete / News
The San Miguel Corporation has also added that the southbound section of the extension project is projected to be open in July of 2021.
-
Skyway extension project northbound to be finished by 2021 Q2 / News
The Department of Public Works and Highways has inspected the northbound segment of the Skyway Extension project and has cleared it for opening in the second quarter of 2021.
-
Road closures implemented for Skyway extension project / News
Alternate routes were provided to motorists who are to traverse the area.
-
San Miguel opens Skyway Stage 3 A. Bonifacio and E. Rodriguez off-ramps / News
On top of that, SMC is also set to open other access points for northbound motorists.
-
Get Notified
Do you want to be the first to know about the latest automotive deals? Just subscribe with your email address and we’ll send you alerts on the most incredible deals as they happen.
You may unsubscribe from these alerts any time. Please review our privacy policy for more information.
-
Skyway Stage 3 to remain toll-free until a toll operator’s permit is given / News
The TRB states that SMC cannot collect toll fees until Skyway Stage 3 reaches 95% completion.
-
SMC commences work on the Skyway Stage 3 to NLEX connector road / News
A new road that will help grant access to northern and southern expressways as well as to the Port area of Manila.
-
MMDA: EDSA traffic should remain manageable thanks to Skyway Stage 3 / News
EDSA traffic flow is now close to what it is during the holiday season.
-
Projected toll fees for Skyway Stage 3 could start at P110 / News
It is still a tentative list but it gives you a general idea of what to expect.
-
Parts of Skyway Stage 3 to temporarily close until Jan 13, 2021 / News
To prepare the expressway for its official opening certain sections will be closed down to make way for construction and other finishing touches.
-
Skyway Stage 3: Currently open entry and exit points / News
If you plan to take Skyway Stage 3 here is a list of entry and exit points to take note of.
-
Skyway stage 3 opens to the public and is toll-free for one month / News
Travel time between the northern and southern expressways has now been reduced.
-
SMC delays opening of the Skyway extension project to February 2021 / News
Positively, SMC shall provide further assistance to the victims of this tragic incident.
-
SLEX motorists will soon have direct access to Skyway via Susana Heights / News
Our roads are being seamlessly connected for better travel experience.
-
Skyway 3 shall be open for free public use for a month starting December / News
This shall vastly improve the traffic situation going through north and south.